Raleigh-Durham Airport Terminal 2

ico-arrow-long
ico-arrow-long

Project Overview

Enhanced obsolete control system for entire terminal without losing any operational time.

Solutions Provided

Incorporated daylight harvesting technology in the main terminal for energy savings along with lighting energy usage reports terminal wide.