Raleigh-Durham Airport Terminal 2
Project Overview
Enhanced obsolete control system for entire terminal without losing any operational time.
Solutions Provided
Incorporated daylight harvesting technology in the main terminal for energy savings along with lighting energy usage reports terminal wide.